A428 / Black Cat

Consultation on the preferred route


A428 Black Cat to Caxton Gibbet – Highways England consultation booklet – June 2019.

The preferred route for the A428 Black Cat to Caxton Gibbet Scheme, including the three roundabout options, was announced a little while ago – it was known as the ‘Orange Route’, along with Option C for the Black Cat roundabout.

That’s not quite the end of the story, for Highways England is running a consultation which looks at the detail of the proposal.

The consultation ends on 28th July 2019 and includes eight public meetings – as detailed on this flyer.

Go to the Highways England site for maps, full details and a couple of very natty ‘Fly through’ videos.

There’s also a new booklet about the project – which puts the start of construction at later 2021 and completion in 2025/26.

Post created 10 June 2019.